Build Terms & Conditions
W J STUBLEY SUPPLIES LTD Trading as W J Stubley Kitchens & Bathrooms
TERMS & CONDITIONS
EXTENSIONS, RENOVATIONS & GENERAL BUILDING WORKS
These Terms & Conditions apply to domestic extensions, alterations, renovations and general building works undertaken by W J Stubley Supplies Ltd.
1. ABOUT THESE TERMS
These Terms & Conditions apply to extension, renovation, alteration and general building works supplied or carried out by W J Stubley Supplies Ltd (“we”, “us” or “the Company”).
Depending upon the agreed specification, works may include:
- extensions and structural alterations;
- internal renovations;
- demolition and strip-out;
- brickwork and blockwork;
- structural steelwork;
- roofing;
- carpentry and joinery;
- plastering;
- plumbing and heating;
- electrical work;
- drainage;
- flooring;
- tiling;
- decorating;
- kitchen and bathroom installation;
- windows and doors; and
- associated building works.
These Terms & Conditions should be read together with the accepted quotation, specification, drawings, schedule of works, payment schedule and subsequent written variations.
Together these documents form the contract between us and the customer (“you”).
Where there is an inconsistency between these Terms & Conditions and a specific written term contained within the accepted quotation or subsequently agreed written variation, the specifically agreed written term will take priority.
Nothing within these Terms & Conditions excludes, restricts or affects your statutory rights as a consumer.
2. QUOTATIONS
Unless otherwise stated, quotations are valid for 3 months from their date.
Our quotation is based upon the information reasonably available when it is prepared, including:
- drawings supplied to us;
- specifications;
- schedules of work;
- structural information;
- visible site conditions;
- measurements reasonably obtainable;
- information supplied by the customer or their professional advisers; and
- discussions held before quotation.
Unless expressly stated otherwise, our quotation is based upon a non-invasive inspection.
We cannot reasonably price for concealed conditions which are not visible or identifiable before work begins.
3. CONTRACT PRICE
The contract price relates to the scope and specification identified within the accepted quotation.
The contract price should not be interpreted as including work which:
- is not included within the quotation;
- results from a customer-requested change;
- results from inaccurate or incomplete information supplied to us;
- becomes necessary because of a concealed or unforeseen condition;
- is required because the existing building differs materially from drawings or information supplied to us; or
- is expressly identified as an estimate, allowance or provisional sum.
Where additional work becomes necessary, the variation provisions within these Terms & Conditions will apply.
4. FIXED PRICES, ESTIMATES, ALLOWANCES & PROVISIONAL SUMS
It is important to distinguish between different types of pricing within our quotations.
Fixed-price items
Where an item is expressly quoted at a fixed price against a clearly defined specification, that price will apply to that specified work unless the scope subsequently changes.
Estimates
An estimate is our reasonable assessment of the likely cost based upon the information available when it is prepared.
The final amount may differ where the actual work, materials or circumstances differ.
Allowances
Where an allowance is included for a product or material which has not yet been finally selected, the allowance represents the amount included within the contract price.
If the final product costs more or less than the allowance, the contract price will be adjusted accordingly.
Provisional sums
A provisional sum is an allowance for work which cannot be accurately priced when the quotation is prepared because its precise extent or specification is not yet known.
Once the actual requirement is established, the provisional sum will be replaced by the actual agreed cost or applicable pricing basis.
5. FORMATION OF THE CONTRACT
The contract is formed when:
- you accept our quotation or otherwise confirm acceptance of the agreed works; and
- any required deposit is received,
subject to any statutory cancellation rights which apply.
Acceptance may be confirmed electronically, including by email.
6. STATUTORY CANCELLATION RIGHTS
Where the contract is entered into at your home, by telephone, email, online or otherwise in circumstances where statutory cancellation rights apply, you may have a legal right to cancel during the applicable cancellation period.
Where applicable, we will provide the required cancellation information.
For many distance and off-premises consumer contracts, the applicable cancellation period is 14 days.
If you expressly request that services begin during an applicable cancellation period and subsequently exercise a statutory right to cancel, you may be required to pay a reasonable amount for services properly supplied up to cancellation, where permitted by law.
Where goods have been made to your specification or are clearly personalised, different cancellation rules may apply.
Nothing within these Terms & Conditions overrides a statutory cancellation right.
7. CUSTOMER CANCELLATION AFTER THE STATUTORY PERIOD
If you cancel the project after any applicable statutory cancellation period has expired, we may recover reasonable losses resulting from the cancellation.
These may include:
- work already undertaken;
- materials already purchased;
- bespoke or non-returnable goods;
- supplier cancellation or restocking charges;
- professional costs specifically incurred for the project;
- reasonable demobilisation costs; and
- other reasonable losses directly resulting from cancellation.
We will not impose a cancellation charge which is unfair or disproportionate.
Any advance payments will be taken into account when calculating the final amount.
8. DEPOSIT & PAYMENT SCHEDULE
A project-specific payment schedule will normally be issued before work begins.
Unless otherwise agreed, a deposit may be required to:
- reserve the project within our programme;
- begin project preparation;
- secure subcontractors;
- order materials; and
- place specialist or made-to-order product orders.
Larger building projects will normally be subject to stage payments.
The precise stages and amounts will be confirmed in writing before commencement.
Stage payments may relate to completed stages of work, materials ordered or supplied, or other objectively identifiable project milestones.
Payment stages form part of the contract.
9. STAGE PAYMENTS
The customer agrees to make payments according to the agreed payment schedule.
We will issue the relevant invoice when the applicable payment stage has been reached.
Payment of a stage invoice does not prevent the customer from subsequently raising a legitimate defect relating to that work.
Likewise, the existence of a minor snagging item relating to an earlier stage will not normally justify withholding payment for all otherwise properly completed work.
Where a genuine dispute exists, both parties will act reasonably in identifying the amount genuinely in dispute.
Undisputed amounts remain payable.
10. LATE PAYMENT
If an undisputed payment becomes materially overdue, we may give written notice requiring payment.
If payment remains outstanding after reasonable notice, we may suspend further work until the account is brought up to date.
Any reasonable consequences of a customer-caused suspension, including changes to the programme and reasonable remobilisation costs, may be reflected in the revised project arrangements.
11. OWNERSHIP OF MATERIALS
Where permitted by law, materials and goods supplied by us remain our property until they have been paid for in full.
This does not affect the customer’s statutory rights.
Materials incorporated permanently into the property will be treated in accordance with applicable law.
12. DRAWINGS & SPECIFICATION
Our quotation is based upon the drawings, specification and information identified within it or otherwise supplied to us when pricing.
The customer must ensure that we receive the latest approved versions of all relevant drawings and specifications.
We are not responsible for additional costs arising solely because we were supplied with outdated, inaccurate or incomplete drawings or information, where we could not reasonably have identified the error.
If revised drawings change the scope after our quotation has been accepted, the change will be treated as a variation.
13. ARCHITECTS, ENGINEERS & OTHER PROFESSIONALS
Unless expressly included within our quotation, architectural, structural engineering, surveying and other professional services are not included.
Where the customer appoints an architect, structural engineer, surveyor, designer or other professional directly, that professional remains responsible for their own professional services.
We remain responsible for carrying out our contracted work with reasonable care and skill and for raising obvious concerns which a reasonably competent contractor should identify.
Where we reasonably require clarification from a professional before proceeding safely or correctly, the affected work may be paused until that clarification is received.
14. PLANNING PERMISSION
The customer is responsible for ensuring that any necessary planning permission, lawful-development approval, listed-building consent, conservation-area consent or other planning approval has been obtained before the relevant work commences, unless our quotation expressly states that we are responsible for arranging it.
Where we have expressly agreed to arrange an application, the application fee and professional costs will be dealt with as stated in our quotation.
We cannot guarantee that an application will be approved.
Work requiring approval will not normally commence until the necessary permission is in place.
15. BUILDING REGULATIONS & BUILDING CONTROL
Building Regulations approval is separate from planning permission.
Where applicable, the works must comply with relevant Building Regulations requirements.
The quotation or project documentation should identify who is responsible for arranging Building Control approval.
Where we have agreed to administer Building Control arrangements, applicable authority or registered building-control fees will be charged as stated within the quotation.
Where the customer, architect or another party is responsible, the customer must ensure that the appropriate notices, applications and inspections are arranged.
We will provide reasonable cooperation with Building Control inspections relating to our work.
16. BUILDING CONTROL INSPECTIONS
Certain stages of work may need to remain exposed until inspected.
This can include excavations, foundations, drainage, damp-proofing, insulation, structural elements and other regulated works.
We are not responsible for delays caused solely by the availability of Building Control inspectors or other approving bodies.
We will not knowingly conceal work where an inspection is reasonably required before it is covered.
17. BUILDING CONTROL REQUIREMENTS & ADDITIONAL WORK
A Building Control body may require work which was not reasonably identifiable from the drawings or specification available when we quoted.
Where such additional work falls outside the original scope, it will be treated as a variation.
This does not apply where the additional work is required solely because our contracted work failed to comply with requirements for which we are responsible.
18. STRUCTURAL ENGINEERING
Where structural work is required, suitable structural calculations and details may be necessary.
Structural steel sizes, padstones, foundations and other structural elements will be installed according to the applicable approved design or engineer’s specification where one is required.
If site conditions differ materially from those assumed by the structural engineer, work may need to stop while revised instructions are obtained.
Any resulting additional work outside our original scope may constitute a variation.
19. PARTY WALLS & NEIGHBOURING PROPERTY
The customer is responsible for obtaining advice regarding the Party Wall etc. Act 1996 and serving any required notices unless we expressly agree otherwise.
Any Party Wall surveyor fees or professional costs are excluded unless specifically included within our quotation.
We will take reasonable care when working adjacent to neighbouring property.
The customer should advise us of any relevant Party Wall Awards or restrictions before work commences.
20. BOUNDARIES & OWNERSHIP
The customer is responsible for confirming property boundaries and that the proposed work is being undertaken on land where they have the legal right to carry it out.
We are entitled to rely upon boundary information, drawings and instructions supplied to us unless an issue is reasonably apparent.
Any dispute regarding ownership or boundaries may require work to be suspended until resolved.
21. ACCESS
The customer must provide reasonable access to the property during the agreed working period.
This includes reasonable access for employees and subcontractors, delivery vehicles, skips, materials, plant and equipment, and inspections.
The customer must inform us before quotation or commencement of any known access restrictions.
Unexpected access difficulties may result in additional costs where they materially affect the method or duration of the work.
22. WORKING AREA & SITE FACILITIES
The customer should remove personal belongings, valuables and fragile items from the working area before commencement.
We will require reasonable access to water, electricity, WC facilities and hand-washing facilities.
Where the customer does not wish existing WC facilities to be used, temporary facilities can be arranged where practicable and will be charged as an additional project cost unless already included.
23. PETS & CHILDREN
Building sites contain unavoidable hazards.
Customers are responsible for ensuring that children, pets and other occupants do not enter active working areas.
Doors and gates may need to remain open temporarily for deliveries and movement of materials.
Flooring, walls and other parts of the building may also be temporarily open or incomplete.
24. SITE SECURITY
We will take reasonable precautions to secure working areas when leaving the site.
During extension and renovation work, the property may temporarily be less secure than under normal circumstances because walls, windows, doors or other elements may be removed.
Where additional temporary security measures are required, these will be discussed and may constitute an additional cost unless included within the quotation.
25. CONCEALED & UNFORESEEN CONDITIONS
Renovation and extension projects inherently involve existing structures which cannot always be fully assessed before work begins.
Examples include:
- unsuitable ground;
- unexpected foundation depths;
- buried concrete or obstructions;
- undocumented or defective drainage;
- concealed services;
- rotten timber;
- defective joists;
- structural movement;
- inadequate existing foundations;
- damp or water damage;
- defective roofs;
- asbestos or suspected asbestos-containing materials;
- defective wiring or plumbing;
- hidden steelwork;
- previously altered structures; and
- poor-quality previous construction.
Unless expressly included, work arising from such conditions is outside the original quotation.
We will explain the issue and agree the additional work and price or pricing basis before proceeding wherever reasonably practicable.
26. GROUND CONDITIONS & EXCAVATIONS
Any foundation price is based upon the information reasonably available when quoted.
Actual excavation requirements cannot always be established until ground is opened.
Additional depth, concrete, reinforcement, specialist foundations, excavation, removal of obstructions or other work required because of unexpected ground conditions may constitute additional work.
Where Building Control or a structural engineer reasonably requires foundations to differ from the original assumed specification, the resulting difference in work and materials will be treated as a variation unless the requirement results from an error for which we are responsible.
27. DRAINAGE
Drainage routes shown on plans or assumed during quotation may differ from actual underground conditions.
Additional work arising from unexpected drainage positions, damaged existing drains, insufficient falls, concealed chambers, collapsed drainage, additional Building Control requirements or other previously unidentified drainage conditions may constitute additional work.
We will discuss material changes before proceeding wherever reasonably practicable.
28. ASBESTOS & HAZARDOUS MATERIALS
Our quotation assumes that the working area does not contain unidentified hazardous materials unless expressly stated otherwise.
If suspected asbestos or another potentially hazardous material is discovered, affected work may stop immediately.
Testing, surveys, specialist removal and disposal are not included unless expressly stated.
The project programme may be extended while the issue is safely investigated and resolved.
We will not knowingly disturb suspected asbestos-containing materials without appropriate controls.
29. DEMOLITION & STRIP-OUT
Demolition and removal work can reveal previously concealed defects and can disturb adjoining finishes.
We will exercise reasonable care and skill during demolition.
Some vibration, dust and disturbance are unavoidable.
Where existing plaster, ceilings, floors or decorations are inherently weak or poorly bonded, they may become damaged during otherwise properly executed demolition.
We are not responsible for unavoidable damage resulting solely from a pre-existing weakness which could not reasonably have been identified beforehand.
We remain responsible for damage caused by our negligence or failure to exercise reasonable care and skill.
30. EXISTING STRUCTURE
Alteration of an existing property can expose historic defects or weaknesses.
Where additional support, repair or structural work becomes reasonably necessary because of the existing structure, this will be explained and treated as additional work where outside the agreed scope.
We will not knowingly continue work in a manner which we reasonably consider unsafe.
31. TEMPORARY WORKS
Temporary supports, protection and other temporary works reasonably necessary for the agreed construction method will be provided where included within our responsibility.
More substantial specialist temporary works or engineered temporary support which could not reasonably have been anticipated may constitute additional work.
Customers must not remove, alter or interfere with temporary supports, barriers or protective measures.
32. WEATHER
External construction work is affected by weather.
Rain, freezing temperatures, excessive heat, high winds and other adverse conditions can prevent certain activities from being carried out safely or correctly.
Weather may affect excavation, brickwork, roofing, rendering, concrete, external decoration and other weather-sensitive operations.
Reasonable weather-related delays will extend the programme where necessary.
We will not undertake work merely to maintain a programme where doing so would compromise safety, workmanship or manufacturer requirements.
33. MATERIAL AVAILABILITY
The project programme may be affected by manufacturer or supplier availability.
If a specified product becomes unavailable, discontinued or subject to an unreasonable delay, we will discuss suitable alternatives with the customer.
We will not substitute a materially different visible product without agreement.
Where the customer chooses a more expensive alternative, the difference will be added to the contract price.
34. MATERIAL PRICE CHANGES
Once an order has been accepted and materials have been ordered, the agreed price for those materials will normally apply.
For longer projects, where specific materials have not yet been ordered and an exceptional supplier or manufacturer price increase occurs outside our reasonable control, we will discuss the impact before ordering.
We will not impose an arbitrary price increase unrelated to an actual increased project cost.
Any price adjustment will be reasonable and supported by the circumstances giving rise to it.
35. CUSTOMER-SUPPLIED MATERIALS & PRODUCTS
Where the customer chooses to supply materials, fixtures or products, they are responsible for ensuring that those products are suitable, correct, compliant, complete, available when required and compatible with the agreed works.
We will exercise reasonable care and skill when installing customer-supplied products.
We are not responsible for inherent defects, incorrect products, missing components or supplier delays outside our control.
Additional labour or attendance caused by customer-supplied products may be chargeable.
Where we expressly advise upon or specify a customer-supplied product, we remain responsible for exercising reasonable care and skill in giving that advice.
36. VARIATIONS
A variation is a change to the agreed scope after the contract has been formed.
Variations may arise because of:
- customer requests;
- revised drawings;
- design changes;
- Building Control requirements;
- structural engineer requirements;
- concealed conditions;
- changes to products or finishes;
- additional work; or
- omissions requested by the customer.
Where reasonably practicable, variations will be agreed in writing before the work is undertaken.
A variation may affect both the contract price and programme.
37. PRICING ADDITIONAL WORK
Additional work may be separately quoted, priced using an agreed schedule or rate, charged on a labour-and-material basis or otherwise priced as agreed in writing.
The applicable method will be communicated before the additional work is undertaken wherever reasonably practicable.
Emergency work reasonably required to make the building safe or prevent significant damage may need to proceed before a complete quotation can be prepared.
38. OMITTED WORKS
If the customer asks us to remove work from the agreed scope, any credit will reflect the reasonable cost saving actually achieved.
The credit will not necessarily equal the amount that might have been charged for the item as a standalone piece of work because some overheads, labour, preliminaries or associated costs may already have been incurred or may remain unchanged.
Any credit will be calculated reasonably.
39. CUSTOMER INSTRUCTIONS
Instructions which affect specification, design, price, programme, materials, positions, dimensions or scope must be communicated to our designated project contact.
Individual tradespeople should not be relied upon to agree significant contractual changes or prices unless authorised by us.
This protects both parties by ensuring that changes are properly recorded.
40. PROGRAMME & COMPLETION DATES
Any commencement date or completion period is our reasonable estimate unless expressly confirmed in writing as a fixed contractual deadline.
Building programmes can be affected by matters including weather, Building Control inspections, structural engineer instructions, unforeseen conditions, supplier delays, customer variations, drying and curing times, utility interruptions, illness, customer-supplied products and circumstances outside our reasonable control.
We will keep the customer reasonably informed of material changes.
41. EXTENSIONS OF TIME
The estimated programme may reasonably be extended where delay results from:
- customer-requested variations;
- delayed customer decisions;
- lack of access;
- late payments;
- unforeseen site conditions;
- professional or regulatory instructions;
- adverse weather;
- delayed customer-supplied goods;
- circumstances outside our reasonable control; or
- additional work.
Where practicable, we will advise the customer when we become aware that a material delay is likely.
42. CUSTOMER DELAYS
If the customer causes or requests a significant delay, we cannot guarantee that work will recommence immediately when the customer becomes ready.
Trades and subcontractors may already have been committed elsewhere.
We will make reasonable efforts to reschedule the project.
Reasonable additional costs directly caused by the customer delay, including remobilisation, storage or additional attendance, may be charged.
43. SUSPENSION OF WORK
We may suspend work where:
- an undisputed payment is materially overdue;
- the site is unsafe;
- access is prevented;
- required information or decisions have not been supplied;
- necessary approvals are unavailable;
- customer-supplied materials are unavailable;
- continuing would risk damage;
- continuing would breach legal or regulatory requirements; or
- circumstances outside our reasonable control make continuation impracticable.
Where practicable, we will provide reasonable notice and explain what is required for work to recommence.
44. UTILITIES
During construction, water, electricity, gas, heating or drainage may need to be temporarily disconnected.
We will take reasonable steps to minimise disruption.
Where continuous services are essential because of a customer’s particular circumstances, the customer should tell us before work begins so that reasonable arrangements can be discussed.
Temporary alternative services are not included unless expressly stated.
45. ELECTRICAL WORK
Electrical work included within our scope will be undertaken by suitably competent persons.
Previously unidentified defects or upgrades required to enable the new work to comply with applicable requirements may constitute additional work where they could not reasonably have been identified beforehand.
46. GAS WORK
Gas work will only be carried out by an appropriately registered Gas Safe engineer.
Existing gas defects or additional work required for a compliant installation may constitute additional work where outside the agreed scope.
47. PLUMBING & HEATING
Existing plumbing and heating systems are outside our control before work commences.
Older pipework, valves, boilers, cylinders or heating components may reveal defects when systems are drained, altered or repressurised.
We are not responsible for failures resulting solely from pre-existing defects which could not reasonably have been identified.
We remain responsible for defects caused by our workmanship or negligence.
48. ROOFING & WEATHERPROOFING
Where roof works form part of the project, we will take reasonable steps to protect the building during construction.
There may be periods during which the permanent roof covering is incomplete.
Reasonable temporary weather protection will be used where appropriate.
Exceptionally severe weather can overcome temporary protection despite reasonable precautions.
We remain responsible where water ingress or damage results from our failure to take reasonable precautions.
49. WINDOWS & DOORS
Windows and doors supplied by us will be installed in accordance with the agreed specification and applicable requirements.
Dimensions may require final site measurement before manufacture.
Once bespoke windows, doors or glazing have entered manufacture, customer-requested changes may incur significant additional costs.
50. DECORATING
Decorating is only included where expressly identified within the quotation.
Building work can cause minor movement, shrinkage and drying as new materials settle.
Minor shrinkage cracking can occur in new plaster, timber and junctions between new and existing construction.
Where such cracking is normal settlement rather than defective workmanship, subsequent decorative maintenance may be the customer’s responsibility.
This does not exclude our responsibility for defective workmanship.
51. NATURAL DRYING & SHRINKAGE
New construction contains moisture and materials which require time to dry and settle.
Reasonable shrinkage can occur in plaster, timber, sealants, caulk, junctions between materials and newly constructed areas.
Customers should maintain reasonable heating and ventilation following completion.
Normal minor drying and shrinkage effects do not necessarily constitute defects.
52. FLOORING, TILING & FINISHES
Where flooring, tiling or decorative finishes are included, they will be installed in accordance with the agreed specification and appropriate installation requirements.
Natural and manufactured products may exhibit reasonable variations in shade, texture, pattern or dimensions.
Movement within the building can affect rigid finishes.
We will make reasonable provision for foreseeable movement where required.
53. PROTECTION OF EXISTING PROPERTY
We will take reasonable precautions to protect existing areas affected by our work.
Construction work inevitably creates dust, vibration and traffic through the property.
Customers should remove fragile or valuable belongings from affected areas and access routes.
We remain responsible for damage resulting from our negligence or failure to exercise reasonable care and skill.
54. SKIPS & WASTE
Waste disposal is included only where stated within the quotation. On larger projects, normal process is to quote for an allowance for reasonable costing. Customers will be charged for actual amount of skips/grabs used.
Where skips are provided, customers must not place their own waste in them without our permission.
Prohibited or hazardous waste must not be placed within skips.
Additional charges resulting from unauthorised customer waste may be passed on where reasonable.
55. SCAFFOLDING & ACCESS EQUIPMENT
Scaffolding, towers, lifting equipment and other access equipment are included only where stated or reasonably implicit within the agreed scope.
Customers must not alter, climb upon or interfere with construction equipment.
Additional hire caused by customer delay or customer-requested changes may be chargeable where reasonable.
56. SUBCONTRACTORS
We may subcontract any appropriate part of the works to suitably skilled specialist trades.
Where a subcontractor is engaged by us to fulfil our contract, their involvement does not remove any responsibility we have to the customer under our contract or applicable law.
57. HEALTH & SAFETY
We will manage our work in accordance with applicable health and safety requirements.
The customer must follow reasonable site-safety instructions.
Active construction areas should not be entered without permission.
Where the customer remains living within the property during the works, both parties will cooperate to manage reasonable access and safety arrangements.
58. WORKING HOURS
Our normal working hours and site attendance may vary depending upon the work being undertaken and the trades required.
Some operations may need to take place at specific times because of deliveries, concrete, inspections, weather or specialist subcontractors.
We will make reasonable efforts to minimise unnecessary disturbance.
59. COMPLETION
The project will be considered substantially complete when the contracted works are substantially finished and capable of their intended use, notwithstanding minor snagging or outstanding items which do not materially prevent normal use.
Substantial completion does not remove our obligation to complete outstanding contracted items or rectify qualifying defects.
60. SNAGGING
Following substantial completion, any outstanding snagging items should be identified and communicated to us.
We will be given a reasonable opportunity to inspect and rectify items for which we are responsible.
Minor snagging does not normally justify withholding the whole outstanding balance.
Where appropriate, both parties may agree a reasonable retention relating specifically to outstanding work.
61. THIRD-PARTY REMEDIAL WORK
If you believe our work is defective, you must normally give us a reasonable opportunity to inspect and, where we are responsible, rectify it.
We will not normally reimburse another contractor’s costs where we were not first given a reasonable opportunity to inspect and remedy the problem.
This does not apply where urgent action is reasonably necessary to prevent danger or significant property damage or where the customer otherwise has a legal right to recover such costs.
62. WORKMANSHIP GUARANTEE
In addition to statutory rights, we provide a 12-month contractual workmanship guarantee from substantial completion unless a different written guarantee is expressly provided.
The guarantee covers defects resulting from our workmanship.
It does not cover:
- normal wear and tear;
- accidental damage;
- misuse or neglect;
- normal maintenance;
- normal drying or shrinkage;
- structural movement outside our contracted work;
- inherent defects in customer-supplied materials;
- unauthorised alterations;
- work subsequently undertaken by unrelated third parties; or
- circumstances outside our reasonable control.
An exclusion applies only to the extent that the relevant excluded event caused or contributed to the problem.
IMPORTANT – STATUTORY RIGHTS
Our workmanship guarantee is additional to your statutory rights.
Expiry of our contractual guarantee does not automatically mean that the customer has no legal remedy if our work failed to meet standards required by law.
63. MANUFACTURER WARRANTIES
Products may carry separate manufacturer warranties.
Where appropriate, we will reasonably assist with a warranty claim concerning products supplied by us.
Manufacturer guarantees are additional to and do not replace statutory consumer rights.
64. OUR RESPONSIBILITY
We will perform our contracted services with reasonable care and skill.
We do not exclude or restrict liability where it would be unlawful to do so.
We are not responsible for loss or damage resulting solely from:
- a concealed or pre-existing defect which we could not reasonably have discovered;
- inaccurate information supplied by the customer or their separately appointed professional;
- customer misuse;
- failure to follow reasonable instructions;
- unrelated third-party work;
- inherent defects in customer-supplied goods; or
- circumstances outside our reasonable control,
except to the extent that our breach, negligence or failure to exercise reasonable care and skill caused or contributed to the loss.
65. FINANCE OPTIONS
We may offer customers the opportunity to fund some or all of an eligible project through a third-party finance provider.
Finance is subject to application, status, affordability, eligibility and the finance provider’s terms and conditions.
A finance application does not guarantee acceptance.
The specific finance amount, repayment period, interest rate, APR, monthly payments and other applicable terms will be contained within the relevant finance information and credit agreement.
Where only part of a project is being financed, any amount not covered by the finance agreement remains payable by the customer in accordance with the agreed project payment schedule.
Where additional works, variations or unforeseen works increase the contract price after finance has been arranged, those additional amounts are not automatically included within the existing finance agreement.
Any additional amount must either:
- be paid directly by the customer in accordance with the agreed payment arrangements; or
- be included within amended or additional finance where available and approved by the finance provider.
We are not responsible for a finance provider declining an application or refusing to increase or amend an existing finance facility.
Where payment to us through the finance provider depends upon a particular stage of the project being reached, the customer agrees to complete any reasonably required documentation or confirmation once that stage has genuinely been reached.
The use of finance does not reduce or replace the customer’s statutory rights in relation to the goods or services supplied by us.
Any rights or remedies available under the applicable finance agreement or consumer-credit legislation remain unaffected.
Nothing within this section excludes, restricts or affects the customer’s statutory rights.
66. VAT
VAT will be charged at the rate legally applicable to the relevant supply.
The VAT treatment of building works can depend upon the nature of the property and work being undertaken.
Where a reduced or zero rate is claimed, we may require appropriate information, evidence or declarations before applying that VAT treatment.
We will apply the VAT treatment which we reasonably consider legally applicable based upon the information available to us.
Where a project contains supplies subject to different VAT treatments, these may be apportioned where required or permitted by law.
67. DISABILITY ADAPTATIONS
Where extension or renovation work is being undertaken for a disabled person, certain individual goods or services may qualify for VAT relief where the applicable statutory requirements are satisfied.
The fact that a project assists a disabled person, receives grant funding or has been recommended by an Occupational Therapist does not automatically mean that the entire project is zero-rated.
Where VAT relief is claimed, we may require an appropriate eligibility declaration and supporting information.
The customer is responsible for providing complete and accurate factual information.
As the VAT-registered supplier, we remain responsible for applying the VAT treatment which we reasonably consider legally appropriate.
68. PHOTOGRAPHS & PROJECT RECORDS
We may take photographs during the project where reasonably necessary for surveys, project records, progress, Building Control, technical queries, quality control, warranty matters and dispute resolution.
Where consent is legally required, appropriate permission will be obtained before identifiable photographs of the customer’s property are used for marketing.
69. COMPLAINTS
We aim to resolve complaints promptly and fairly.
Complaints should preferably be submitted in writing so that both parties have an accurate record.
We will investigate within a reasonable period taking account of the nature and complexity of the matter.
Where appropriate, an independent professional, specialist or dispute-resolution service may be suggested.
Nothing within our complaints procedure prevents either party from exercising legal rights available to them.
70. DATA PROTECTION
We handle personal information in accordance with applicable UK data-protection legislation, including the UK GDPR and Data Protection Act 2018 as amended.
Information may be processed where reasonably necessary to prepare quotations, administer the project, order materials, schedule trades, communicate with professional advisers, arrange inspections, administer finance where applicable, issue invoices, manage guarantees and comply with legal obligations.
Further information should be contained within our Privacy Notice.
71. STATUTORY CONSUMER RIGHTS
These Terms & Conditions operate alongside the customer’s statutory consumer rights.
Nothing within them seeks to exclude or restrict a right which cannot lawfully be excluded or restricted.
Where the Consumer Rights Act 2015 applies:
Services must be carried out with reasonable care and skill.
Where no time for performance has been fixed, the law may require services to be completed within a reasonable time.
Where no price has been agreed, the law may require the customer to pay a reasonable price.
Goods supplied under the contract must comply with applicable statutory requirements, including requirements relating to satisfactory quality, fitness for purpose where applicable and conformity with description.
Statutory remedies may be available where goods or services do not conform to the contract.
Our contractual workmanship guarantee is additional to these statutory rights.
72. EVENTS OUTSIDE OUR REASONABLE CONTROL
Neither party will be responsible for a failure or delay caused by circumstances genuinely outside that party’s reasonable control.
Examples may include exceptional weather, major transport disruption, utility failures, industrial action, serious supplier disruption, restrictions imposed by authorities or comparable events outside reasonable control.
The affected party should notify the other as soon as reasonably practicable.
Where such circumstances prevent performance for a significant period, both parties will discuss reasonable options for completing or ending the affected part of the contract.
73. TERMINATION BY US
We may terminate the contract where there is a serious breach by the customer which has not been remedied within a reasonable period following written notice.
Examples may include:
- persistent non-payment of undisputed amounts;
- repeated prevention of reasonable site access;
- serious interference with health and safety;
- requiring us to undertake unlawful or unsafe work; or
- another substantial breach preventing reasonable continuation of the project.
On termination, the customer will be responsible for amounts properly due for work completed, materials properly ordered and reasonable losses resulting from the breach, subject to applicable law.
We will account for advance payments when calculating the final balance.
74. TERMINATION BY THE CUSTOMER
Nothing within these Terms & Conditions prevents the customer from exercising any statutory or contractual right to terminate the contract.
Where termination results from our serious breach, the customer’s statutory remedies remain unaffected.
Where the customer terminates without a breach by us and outside any applicable statutory cancellation right, the cancellation provisions within these Terms & Conditions will apply.
75. SEVERABILITY
If a provision is found to be invalid or unenforceable, it will be removed or limited only to the extent necessary.
The remaining provisions will continue to apply.
76. NO WAIVER
Failure by either party to immediately enforce a contractual right does not necessarily mean that right has been waived.
77. THIRD-PARTY RIGHTS
Unless expressly stated otherwise, the contract is between W J Stubley Supplies Ltd and the customer and is not intended to give contractual rights to unrelated third parties.
78. GOVERNING LAW
These Terms & Conditions and the contract are governed by the applicable law of England and Wales.
Where the customer is a consumer, nothing within this clause deprives them of mandatory consumer protection or any right to bring proceedings in a court available to them under applicable law.
79. CONTRACT DOCUMENTS
The contract may comprise:
- the accepted quotation;
- schedule of works;
- drawings;
- specification;
- structural details where applicable;
- these Terms & Conditions;
- agreed payment schedule;
- applicable cancellation information;
- finance documentation where applicable; and
- subsequent written variations.
Customers should retain copies of these documents.
IMPORTANT CUSTOMER NOTICE
Extension and renovation work differs from straightforward product installation because a significant part of the existing building is concealed before construction begins.
Please therefore pay particular attention to the provisions concerning:
- the agreed scope of works;
- drawings and specifications;
- fixed prices, estimates and provisional sums;
- planning permission;
- Building Regulations;
- structural engineering;
- Party Wall requirements;
- ground conditions;
- foundations and drainage;
- concealed defects;
- asbestos and hazardous materials;
- customer-supplied products;
- variations and additional works;
- stage payments;
- weather and project delays;
- completion and snagging; and
- the workmanship guarantee.
Nothing within this contract affects your statutory rights as a consumer.